Commercial & Industrial

Power Your Business, Bankable Returns

Turnkey C&I solar with GITA tax incentives, third-party PPAs and self-consumption models — from 100 kW to 5 MW.

250+
MW Delivered
IRR 15%+
Typical Returns
GITA
Tax Ready
Commercial rooftop solar installation
Financing

Flexible ways to fund your system

Own it, lease it, or pay as you generate — we tailor financing to your cashflow.

Zero capex

Solar PPA

Zero capex. Buy only the solar kWh you consume at a discounted tariff.

GITA Incentive

100% capital allowance under Green Investment Tax Allowance for eligible assets.

Green Financing

SME Bank / AmBank / Maybank green loans up to 15-year tenure.

Installation Timeline

From site visit to switch-on in 8–12 weeks

A transparent, milestone-driven process managed end-to-end by EDCA.

Step 01

Site Assessment

Free rooftop survey, shading analysis, and consumption audit.

Day 1–3
Step 02

System Design

Custom PV layout, single-line diagram, and yield simulation.

Day 4–10
Step 03

Approvals

SEDA NEM 3.0 application, TNB and local authority permitting.

Week 3–8
Step 04

Installation

Mounting, wiring, inverter and battery commissioning by certified crew.

Week 9–10
Step 05

Commissioning

TNB meter change, monitoring hand-over and first-generation walkthrough.

Week 11
Warranty

Backed for the long haul

Independent warranty on every layer of the system — modules, electronics, workmanship.

25 Years

Solar Panels

Tier-1 modules with linear performance warranty ≥84.8% at year 25.

10 Years

Inverter

Extendable up to 25 years on premium brands (Huawei, SMA, Sungrow).

5 Years

Workmanship

Full labour and installation warranty by our SEDA-certified team.

Operations & Maintenance

Ongoing care to protect your yield

An underperforming system is lost revenue. Our O&M keeps it running at spec.

Preventive Maintenance

Bi-annual visual inspection, thermal imaging and torque checks.

Monitoring 24/7

Real-time yield dashboard with SLA-backed fault response.

Panel Cleaning

Scheduled cleaning cycles to preserve peak generation efficiency.

Price Range

Transparent, tiered pricing

Indicative starting prices. Final quote is issued after your free site assessment.

SME
100 – 300 kW
RM 2.60 / Wp
  • String inverters
  • GITA support
  • Monitoring portal
  • Annual O&M
Most popular
Corporate
300 kW – 1 MW
RM 2.20 / Wp
  • Central inverter option
  • PPA available
  • Structural certification
  • SLA O&M
Utility
1 MW+
On Request
  • Bespoke design
  • Financial modelling
  • Turnkey EPCC
  • Long-term O&M

Ready to Switch to Solar?

Book a free site assessment and get a bespoke system design with 25-year performance backing.

Get A Free Quote